Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Thailand flooding leaves 71 dead and millions affected

    October 13, 2026

    WHO sets global 24-hour target for emerging health threats

    October 13, 2026

    Meta rolls out Muse Wonder models for agentic AI tasks

    October 13, 2026
    Facebook X (Twitter) Instagram
    malireview.commalireview.com
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    malireview.commalireview.com
    Home » First GE HA turbines to be installed at UAE Power Plant
    Business

    First GE HA turbines to be installed at UAE Power Plant

    March 17, 2021
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    The UAE’s first two GE HA gas turbines have been delivered, and are currently undergoing installation and commissioning works at the 1.8 gigawatts (GW) Hamriyah Independent Power Plant. The project is expected to be the most efficient power plant in the Middle East’s utilities sector, contributing towards UAE Energy Strategy’s goal of reducing the carbon footprint of power generation. GE is supplying a total of three 9HA.01 units and other power generation technologies for the facility. It will also provide parts, repairs and maintenance services for power generation assets at the site for a period of approximately 25 years.

    First GE HA turbines to be installed at UAE Power Plant

    Co-developers GE Energy Financial Services (“GE EFS”) and Japan’s Sumitomo Corporation (“Sumitomo”) signed an approximately 25-year Power Purchase Agreement (PPA) with Sharjah Electricity, Water and Gas Authority (SEWA) in 2018 to develop, build and operate the plant. Following financial close in 2019, co-developers along with Shikoku Electric Power Company and Sharjah Asset Management (“SAM”), the investment arm of the Government of Sharjah, formed a joint venture company – Sharjah Hamriyah Independent Power Company (SHIPCO) – to build, own and operate the project, which is the first independent combined cycle power plant in Sharjah.

    GE’s HA technology is the fastest growing fleet of heavy-duty gas turbines globally and has already set two world records for efficiency, one each in the 60 hertz and 50 hertz segments of the power market. Higher efficiency levels mean that less fuel needs to be consumed and that there are fewer emissions per megawatt of electricity generated. In fact, using three GE 9HA.01 units in combined cycle operations can help SEWA reduce carbon dioxide emissions by up to 4 million tons per year, compared to current levels. This is the equivalent of taking 1 million cars off the UAE’s roads.

    A team of over 1,300 people has been mobilized for the project. In addition to the two HA units, GE Gas Power has also already delivered several other pieces of key equipment at the site, including two steam turbines, two gas turbine generators, two steam turbine generators, two Heat Recovery Steam Generators (HRSG), two condensers, power island e-rooms and step-up transformers. Almost all the civil works, up to 85 percent of the procurement, and up to 60 percent of construction and commissioning works at the Hamriyah project, are now complete.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email

    Related Posts

    Oman electricity output grows as water production declines

    October 12, 2026

    Indonesia logs $7.33 billion in 2026 foreign inflows

    October 12, 2026

    African Union launches Africa Credit Rating Agency

    October 9, 2026

    Debt-ridden Pakistan SOE debt climbs to $36.5 billion

    October 7, 2026
    Latest News

    Thailand flooding leaves 71 dead and millions affected

    October 13, 2026

    WHO sets global 24-hour target for emerging health threats

    October 13, 2026

    Meta rolls out Muse Wonder models for agentic AI tasks

    October 13, 2026

    Oman electricity output grows as water production declines

    October 12, 2026

    Pakistan emergency suspends PTI rule in Khyber Pakhtunkhwa

    October 12, 2026

    Indonesia logs $7.33 billion in 2026 foreign inflows

    October 12, 2026
    © 2026 Mali Review | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.